Project Overview

The Mountain Creek Dam project presented unique geological challenges that required innovative foundation engineering solutions. This 95-meter concrete gravity dam was constructed on complex rock formations, necessitating advanced foundation treatment methods and extensive geological analysis. The project showcased cutting-edge techniques in rock anchoring and foundation stabilization.

Project Gallery

Mountain Creek Dam foundation work

Foundation engineering showing rock anchoring systems

Key Challenges

  • Unstable rock formations requiring extensive foundation treatment
  • Remote location with limited access for heavy equipment
  • Extreme temperature variations affecting concrete curing
  • Complex groundwater management during construction

Innovative Solutions

  • Implemented advanced rock anchoring systems with post-tensioned cables
  • Developed specialized concrete mixes for extreme temperature conditions
  • Created comprehensive dewatering systems for foundation work
  • Established remote monitoring systems for construction quality control

Project Specifications

Height
95 meters
Length
220 meters
Volume
800 million cubic meters
Cost
$650 million
Duration
30 months
Team Size
70+ engineers