Back to Timeline
Environmental Engineering
Completed

Riverside Dam Environmental Project

2017 - 2019
Oregon, USA
AquaStructures Inc.

Project Overview

The Riverside Dam project focused on creating a sustainable water management solution while prioritizing environmental conservation. This 120-meter earthfill dam with integrated concrete spillway was designed to minimize ecological impact while providing essential flood control and water storage for the region. The project included innovative fish ladder systems and habitat restoration initiatives.

Project Gallery

Riverside Dam with fish ladder

The completed dam featuring integrated fish ladder system

Concrete spillway design

Advanced spillway design ensuring optimal water flow management

Key Challenges

  • Strict environmental regulations requiring minimal ecosystem disruption
  • Integration of fish migration pathways with dam structure
  • Seasonal construction limitations due to wildlife breeding cycles
  • Balancing water storage needs with downstream flow requirements

Innovative Solutions

  • Designed state-of-the-art fish ladder with multiple resting pools
  • Implemented phased construction to minimize wildlife disruption
  • Created artificial wetlands for habitat compensation
  • Developed advanced spillway design for optimal water flow management

Project Specifications

Height
120 meters
Length
280 meters
Volume
1.2 billion cubic meters
Cost
$850 million
Duration
24 months
Team Size
85+ engineers

Interested in Similar Projects?

Let's discuss how my expertise can contribute to your next dam construction project.